
4200×2000×2000mm. Ideal for rural cooperatives, temporary construction sites and space-constrained locations.

Single/dual island options. Suitable for logistics parks, mining, ports and mid-to-large refueling scenarios.

Custom dimensions available. Supporting group-level multi-site deployments.
Standard model specifications below, custom options available
| Spec | 1-5m³ | 10m³ | 20m³ | 30m³ | 40m³ | 50m³ | Custom |
|---|---|---|---|---|---|---|---|
| Dimensions (mm) | Custom | 4200×2000×2000 | Single: 5700×2940×2840 Dual: 7300×2940×2840 | Single: 7500×2940×2840 Dual: 9100×2940×2840 | Single: 9300×2940×2840 Dual: 10900×2940×2840 | Single: 11100×2940×2840 Dual: 12700×2940×2840 | On demand |
| Fuel Types | Methanol / Gasoline / Diesel | ||||||
| Safety Systems | Double-layer tank · Explosion-proof material · Anti-overflow · Auto fire suppression · Emergency relief · High-temp shut-off · Vapor recovery · Smart monitoring | ||||||
| Explosion-Proof | Exclusive dual explosion-proof system, eliminates risks from open flame, lightning, and impact at source | ||||||
| Certifications | Explosion-Proof · ISO Triple System · National Production Permit · Full test reports | ||||||
| Installation | ~3 days from delivery to operation (hardened ground only, no deep foundation) | ||||||

Integrated modular design, installed directly on hardened ground without deep foundation. Typical installation completed within 3 days.

Double-layer tanks, explosion-proof materials, anti-overflow, automatic fire suppression, emergency pressure relief, high-temp auto shut-off. Dual explosion-proof system eliminates explosion risks at source.

Integrated base supports overall lifting and relocation. Suitable for logistics parks, mining areas, ports, rural cooperatives, and temporary construction sites.

Complete national certifications including explosion-proof certification, test reports, and safety permits. Fully compliant with safety and environmental standards.

Factory-standardized production significantly reduces construction costs compared to traditional stations. Smart monitoring enables digital fuel management.

Site survey → Custom design → Production & transport → Installation & commissioning → Annual inspection & maintenance → Technical upgrades. Dedicated team throughout.
Contact us for one-on-one product selection and configuration advice
Get a Quote →